Repair works in Pesek Basin

22 Jul 2021 / Singapore

The working period for repairs in Pesek Basin has been extended. The work will now be conducted from 10 August 2021 to 9 February 2022.

As stated in the Maritime and Port Authority of Singapore Port Marine Notice No.053 Of 2021, the works will be carried out between 0700 to 1900 hours local time daily - including Sundays & Public Holidays - within the working area bounded by the following co-ordinates (WGS 84 Datum):

WORKING AREA A
1. 01°16·994'N / 103°41·766'E
2. 01°17·128'N / 103°41·889'E
3. 01°17·104'N / 103°41·914'E
4. 01°16·970'N / 103°41·625'E

WORKING AREA B
5. 01°16·844'N / 103°41·625'E
6. 01°16·979'N / 103°41·750'E
7. 01°16·954'N / 103°41·776'E
8. 01°16·820'N / 103°41·651'E

Works include maintenance and repairs to existing steel pipe piles at ExxonMobil PAC berths. A safety boat will be deployed to warn other craft in the vicinity of the working area.

Craft involved in the works will exhibit the appropriate local and international day and night signals.

When in the vicinity of the working area, mariners are reminded to:
a) Keep well clear and not to enter the work area;
b) Maintain a proper lookout;
c) Proceed at a safe speed and navigate with caution;
d) Maintain a listening watch on VHF Channel 22 (Jurong Control); and
e) Communicate with Jurong Control for assistance, if required.

For information about operations in Singapore, contact GAC Singapore at [email protected]

If quoting any content from Hot Port News, please cite GAC Hot Port News as the source.